Stockpile Volumes: Why LiDAR Doesn't Pay on Aggregate Work
Aggregate stockpiles are textured and outdoor — where peer-reviewed photogrammetry studies landed within 0.7–1.1% of a GNSS reference volume. When the LiDAR premium isn't earning its keep.
4 articles on LiDAR vs Photogrammetry. Field-tested methodology from a GIS scientist with M.S. GIS, FAA Part 107, and 10+ years of geospatial work.
Aggregate stockpiles are textured and outdoor — where peer-reviewed photogrammetry studies landed within 0.7–1.1% of a GNSS reference volume. When the LiDAR premium isn't earning its keep.
Mavic 3E stack (~$5.8K-8.5K) vs M350+L2 (~$37.6K-40.8K) at October 2026 dealer prices: the per-job cost over 5 years, when the LiDAR premium pays off, and when you're paying for hype.
Peer-reviewed studies show SfM photogrammetry landing within a few centimeters of UAV LiDAR vertical accuracy on bare earth, with roughly a fifth of the hardware capex. The studies, the numbers, and where the claim breaks down.
Doming is the textbook anti-photogrammetry argument. James & Robson 2014 and the oblique-imagery fix show it's a planning problem, not an inherent SfM ceiling.
Topics that show up most often in this category.
Looking for a different angle?
Free download: The Complete Drone Mapping Workflow Guide — 30+ pages of field-tested methodology.
No spam. Unsubscribe anytime.